    SR 114 B and D ANOXIC LIMESTONE DRAIN SYSTEM FACT SHEET


    PUBLIC-PRIVATE PARTNERSHIP
    PA Game Lands No. 95, Washington Township, Butler County, PA

    FUNDING SOURCE:
    Bond Forfeitures Black Fox

    PROJECT PARTICIPANTS:
     
    Hedin Environmental  CDS Associates, Inc
    Jesteadt Excavating District Mining Operations(Knox)
    PA Game Commission

    COMPLETION DATE:
    Major construction completed September 1995
    Water Quality Monitoring ongoing: PA DEP, Knox DMO and Slippery Rock University

    MATERIALS USED FOR TREATMENT:
    ALD B- 450 Tons Limestone Aggregate #1
    ALD D- 1000 Tons Limestone Aggregate #1

    WATER COLLECTION AND DISTRIBUTION:
    Collection: 
    ALD B- In a 120’ anoxic collection system, 6” perforated CPP bedded in gravel. 

    ALD D- 125-gpm flow captured in innovative collection system including the vertical placement of a 12’ long, 3 foot diameter, epoxy-coated, steel casing.

    Inlet:  
    ALD B- From the collection system, the captured flow is distributed by a 4” perforated CPP manifold (23’L) extending along the east end (width) of the drain. 

    ALD D- From the collection system, the captured flow is plumbed onto a 6” PVC pipe and distributed by a 6” perforated CPP manifold (33’L) extending along the east end (width) of the drain. 

    Outlet:  
    ALD B- 4" perforated CPP manifold (23’L) extending along the west end (width) of the drain and plumbed to a 6” PVC pipe, which opens up to a rock lined channel leading to Pond B.
      
    ALD D- 4” perforated CPP manifold (29”L) extending along the south end of the drain and plumbed onto a 6” PVC pipe, which extended 86 feet to Pond D1. 

    SYSTEM DIMENSIONS (FEET):
                                                               Length      Width       Depth       Tonnage/Sq. Foot 
    Anoxic Limestone Drain B                  60            30              5                  450 T
    Anoxic Limestone Drain D                  60            30              2.9               950 T
    Settling Pond #B                                  71            85              4                  6058
    Settling Pond #D1                                137          36              2                  4944 
    Wetland #D2                                         134          52              3 ½              6980
    Wetland #D3                                         119          46              1                  5514
    Wetland #D4                                         108          46             1/5                4847

    SOIL AMENDMENTS AND SEED MIXTURE:
    Birdsfoot trefoil @ 10 lbs/ac; White Dutch clover @ 4 lbs/ac; KY Bluegrass @ 10 lbs/ac; perennial rye@ 6 lbs/ac; 10-20-20 fertilizer @ 300 lbs/ac; Aglime @ 4 tons/ac

    WATER QUALITY (representative):
     
     
     
    Flow
    pH
    Alk
    (mg/L)
     Acid
    (mg/L) 
    Fe (mg/L)
    Pre-construction: Raw
    180
    5.5
    30
    50
    40
    Post-construction: Final
    180
    6.5
    100
    0
    1