    SR109 PASSIVE TREAMENT
    SYSTEM FACT SHEET

    PA Game Lands No. 95, Washington Township, Butler County, PA

    FUNDING SOURCE:
    EPA 104(b)(3) Grant

    PROJECT PARTICIPANTS:

    Puryear Excavating and Trucking PA Bureau of District Mining Operations (Knox)
    Bureau of Mining and Reclamation PA DEP Northwest Regional Office
    PA Game Commission Butler County Conservation District
    NRCS WPCAMR
    PA Fish and Boat Commission Slippery Rock Watershed Coalition
    Slippery Rock University

    COMPLETION DATE:
    Major construction completed August 1998
    Water Quality Monitoring ongoing: PA DEP - Knox DMO

    MATERIALS USED FOR TREATMENT:
    166 yd3 of compost (1 foot layer)

    450 tons of AASHTO No. 1 limestone (3 foot layer)

    WATER COLLECTION AND DISTRIBUTION:
    Collection
    : By check dam and rock lined channel.

    Inlet: From the collection system, flow is distributed vertically down through a 1 foot layer of compost and then continues down through a 3 foot layer of AASHTO No. 1 limestone to the underdrain system consisting of 3 rows of 6" perforated Schedule 40 PVC connected to a 6" Schedule 40 PVC manifold of the vertical flow system.

    Outlet: Flow from the underdrain system rises vertically through 6" Schedule 40 PVC pipes and is discharged to the retention pond/wetland. The current elevation of the outlet of the pipes creates a 4 foot depth of water above the top of the compost. Discharge from the retention pond/wetland is via a rock lined channel to the stream.

    SYSTEM DIMENSIONS (FEET):

      Length Width Depth
    Vertical Flow System 144 91 12
    Retention Pond 70 40 5
    Wetland 70 40 3

    SOIL AMENDMENTS AND SEED MIXTURE:
    Birdsfoot trefoil @ 10 lbs/ac; White Dutch clover @ 4 lbs/ac; Reed Canary Grass @ 15 lbs/ac; Winter Wheat cover @ 120 lbs/ac, Aglime @ 10 tons/ac; 10-20-20 fertilizer; straw @ 3 tons/ac

    WATER QUALITY (representative):

      Flow(gpm) pH alk(mg/l) acd(mg/l) Fe(mg/l) Al(mg/l)
    Pre-construction: Raw 14 4.9 9 14 3.1 0
    Post-construction: Final 12 7.5 135 0 0 0

     



    Copyright ©2006 Stream Restoration Inc.