Projects
 
  • BC19 & 19B
  • Big Bertha
  • Chernicky
  • De Sale Phase I
  • De Sale Phase II
  • De Sale Phase III
  • Erico Bridge
  • Ferris Complex
  • Goff Station
  • Jennings VFP
  • North Liberty
  • SR 87/88
  • SR 89
  • SR 96
  • SR 101a
  • SR 109
  • SR 114
  • Sunbeam Tipple
  • SRW Assessment
  • Slippery Rock WCP
  • JENNINGS WATER QUALITY IMPROVEMENT COALITION
    c/o Stream Restoration, Inc.

    VERTICAL FLOW SYSTEM FACT SHEET

    Jennings Environmental Education Center, PA DCNR, Bureau of State Parks
    Brady Township, Butler County, PA

    FUNDING SOURCE:
    United States Environmental Protection Agency Fiscal Year 1996 Section 319 grant through the Pennsylvania Department of Environmental Protection Bureau of Land and Water Conservation.

    PROJECT PARTICIPANTS:

    Hedin Environmental Jennings Environmental Education Center
    CDS Associates, Inc. Grove City College
    Girl Scouts Home-Body Students
    Jesteadt Excavating PA Bureau of District Mining Operations (Knox)
    Slippery Rock University Shaliston Trucking
    Quality Aggregates Inc. Amerikohl Mining, Inc.
    Stream Restoration Inc. U.S. Department of Energy

    COMPLETION DATE:
    Major construction completed September 1997
    Water Quality Monitoring ongoing: PA DEP, Knox DMO and Slippery Rock University

    MATERIALS USED FOR TREATMENT:
    300 Tons of Spent Mushroom Compost mixed with
    380 Tons of # 9 Special Limestone aggregate.

    WATER COLLECTION AND DISTRIBUTION:
    Overdrain
    : 2" PVC header pipe with 3/4" perforated laterals (20' in length) every 6 feet fed by three 2" inlet pipes from flow splitter box. Flow splitter box is plumbed into previously constructed anoxic collection system.

    Underdrain: Three sections of 2" PVC fed by 3/4" perforated laterals (15' in length) every 6 feet bedded in river gravel.

    Outlet: 4" flexible plastic pipe with clear insert for observation, adjustable to control water level in system.

    SYSTEM DIMENSIONS (FEET):

      Length Width Depth
    Vertical Flow System 150 50 6
    Channel Wetland 175 8 <1/2
    Wetland 100 20 1/2
    Settling Pond 100 20 33

    WATER QUALITY (representation):

      Flow (gpm) pH Alk(mg/I) Acd(mg/I) Fe(mg/I) Al(mg/I)
    RAW 30 3 0 300 50 20
    Final Effluent 30 7 200 0 1 <1


    Copyright ©2006 Stream Restoration Inc.
    Website Designed by Shaun Busler
    Updates by Chris Treter, Matt Bramble, and Alaina Somers